Real Energy Case Studies

M-Sport (Cockermouth)

Located in Cockermouth, Cumbria, PK Engineering Real Energy Division installed 1952 Solar PV 800Kw, 300kw Bio Oil CHP Engines that represent a First Year Savings of £549.323. Total payback in 2.1 years with CO2 Savings per year of 125.700 kg.
This project from Order to Commission took 4 months.

M-Sport (Cockermouth)

David Hayton's (Penrith)

David Hayton's in Penrith reached out to us to install Solar PV panels (152kw). With this installation, the company will have a first-year saving of £44,763 and a total payback of investment in 3.6 years.
The CO2 Savings per year are in the region of 61,370 kg and this project from Order to Commission had a 4-month duration.

David Hayton's (Penrith)

Story Construction (Carlisle)

Story Construction's Head Office in Carlisle opted to install a 107KW PV System which took from Order to Commission just 3 months. Story will see a first-year saving of somewhere in the region of £30,500 and the investment will have a payback of around 3.5 years.
This installation will reduce their carbon footprint every year by 19,826kg.

Story Construction (Carlisle)

Cranston's Food Hall (Penrith)

Cranston's Food Hall & Café Oswald's contracted PK Engineering's Real Energy Division to install a Solar PV System with 138 panels (58.65kw). This project took 3 months to complete from order to commission and will provide them with a first year saving of just under £20.000.
The investment will have a payback period of 3.6 years and reduce their carbon emissions each year by 61,370 kg.

Cranston's Food Hall (Penrith)

Bell's of Lazenby (Penrith)

A total of 1560 (640KW) Solar PV Panels were installed at Bell's of Lazenby which will help them reduce their carbon footprint (CO2 Savings) by 137,965 kg on a yearly basis. Their investment will be paid back within 2 years with a first year saving of £290,000.
Order to Commission period was just 3 months.

Bell's of Lazenby (Penrith)

What our clients said

We are extremely impressed with PK's commitment to detail throughout the whole project. From start to finish we were kept in the loop which led to a smooth and efficient installation.
We are excited that we will now be contributing to a greener world as we reduce our yearly carbon footprint by nearly 150.000 kg.
Overall, very happy with how everything was conducted.