Portfolio

Thumbnail

Completed Projects For Lloyd

Our work for Lloyd Jaguar and Land Rover at Rosehill, Lloyd BMW at Kingstown, and Lloyd BMW and Mini at Cockermouth involved several disciplines we offer in house, including Mechanical, Electrical, Voice and Data and Fire and Security installations.

Thumbnail

Harraby Campus, Carlisle

We thoroughly enjoyed working on this ‘state of the art’ project, at Harraby Campus in Carlisle. We brought together several of our in house disciplines to carry out the Electrical, Mechanical and Fire & Security refit.

Thumbnail

Lodore Falls Hotel

PK Engineering were delighted to be part of the Lodore Falls Hotel’s £7 million upgrade. We completed the creation and installation of the new mechanical and electrical design for the Candleroom in October 2016.

Thumbnail

Lloyd Jaguar and Lloyd Land Rover, Rosehill

PK Engineering were delighted to design and install the complete electrical, heating and ventilation systems for the new Lloyd Jaguar and Lloyd Land Rover showroom at Rosehill, Carlisle. This was an 8 month project carried out to Lloyd’s extremely high standards and also included the installation of a 140kw Solar PV system on the new roof!

Thumbnail

Story Contracting

PK Engineering were responsible for the full mechanical, electrical, voice and data and fire and safety installation for the offices within Story Contracting’s Construction division. The area was revamped as part of the extension and ongoing refurbishment of their Carlisle Head Office.

Thumbnail

Muller

We’re delighted to announce that we are working with Muller, carrying out Electrical and CCTV works to their factories all over the North West!

Thumbnail

Nestle

We were delighted to secure this contract for Swiss giant Nestle! PK Engineering were brought in to help with the refurbishment of their Dalston factory canteen fitting a new Mechanical design.

Thumbnail

Dumfries and Galloway Royal Infirmary

Our mechanical team designed and installed a system inside one of the roof top plant rooms at the Dumfries and Galloway Royal Infirmary which will supply heating and chilled water to the new air handling units, serving a 90 bedroom ward block.

Thumbnail

McVities

The PK Engineering team were responsible for refurbishing the mechanical and electrical design for the main McVities offices.

Thumbnail

Lloyd BMW Centre, Carlisle

PK Engineering were delighted to create and install the full mechanical, electrical, voice and data and fire and security design for Lloyd Motor Group’s new state-of-the-art BMW Centre at Kingstown, Carlisle. 

Thumbnail

Energy Coast UTC

The Energy Coast UTC is a new academy for students which opened in September 2014. With a strong emphasis on science, technology, engineering and maths (STEM subjects), it provides specialist technical training alongside a traditional education which includes GCSEs and A Levels for students aged 14-16. PK Engineering were employed by Eric Wright Construction to […]

Thumbnail

The Halston

Situated in the heart of the Carlisle, The Halston is a spectacular aparthotel with stylish bar, restaurant, spa and specialist function rooms. With 16 apartments it provides luxury accommodation for those visiting Carlisle, whether their stay is for business or pleasure. Housed in a former Main Post Office building, it has been sympathetically restored to […]

Thumbnail

Tweddle Engineering

PK Real supplied and installed four new Biomass Boilers, the installation comprised of separate 199Kw Boilers along with associated heat stores and primary circuits, the boilers are fired by wood chips stored on site and fed to the boilers via turntables.  The systems provide renewable heat to Tweddle Engineering’s main workshops, as well as a […]

Thumbnail

Thomas Graham

PK Engineering carried out the Electrical services to an In-house design which required the fitting of a complete new installation including all distribution plant, Lighting, Lighting controls, Small power and Fire Alarm.  The building comprised of a 75,000sq ft. warehouse for the storing and dispensing of steel products, complete with a two story office section. […]

Thumbnail

Humber Gateway

Humber Gateway 275kV GIS scheme was a new build project for Electricity Alliance North that consisted of the construction of a raised building to accommodate local flood risks. All buildings, substation compounds and auxiliary erections are built on piled foundations due to poor ground conditions and of a reinforced concrete substructure with steel frame and […]

Thumbnail

Wigton Auction Mart

PK Engineering were involved by Story construction at the earliest stage to develop a design for the Heating, plumbing and electrical installation at the new premises for Messr’s Hope’s at Wigton. We were able to work closely with the builder and the client on the development, which combined a new office facility, auction hall, auction rings, […]

Thumbnail

Lanercost Priory

We were approached by the Priory to look at the renewal of the existing heating system which was antiquated and inefficient. They had previously commissioned an initial survey but wanted it taking on to a fully developed design and price. We carried out an extensive survey and provided them with a solution which took account […]

Thumbnail

David Haytons, Carlisle

The new car showroom and offices at David Haytons Carlisle is another mechanical and electrical project which has recently been completed.

Thumbnail

Vindolanda Charitable Trust

The Vindolanda and Roman Army Museum involved both new build and a major refurbishment of both the mechanical and electrical installations.

Thumbnail

Flatbread Project – McVities, Carlisle

PK Engineering has recently carried out the installation and commissioning of a product-handling system for a new cracker product at McVities, Carlisle. This included a dust extraction system and vacuum conveying system. As well as the general installation, PK worked closely with the supplier of the vacuum system to ensure correct operation. A new laser […]

Thumbnail

Wheat kibbling project – Carr’s Flour Mills, Silloth

This project involved the electrical installation and commissioning of conveying equipment and bulk handling facilities. The purpose of the project was to reduce whole grains of wheat in size through kibbling (or cutting) so that they can be used for breakfast cereal manufacture of flaked products.

Thumbnail

BBC’s installation – McVities, Manchester

PK Engineering were a service provider and offered electrical support through the installation of a newly designed biscuit handling system (BBC), an automated biscuit collation and feed system that delivers multiple streams of wrapped product, timed into the infeed of a carton filling machine. The BBC was designed by UB’s Central Engineering Team using servo […]

Thumbnail

Crisp bake system, Cavaghan & Gray, Carlisle

PK Engineering carried out the design, installation and commissioning of Cavaghan & Gray’s Crisp bake cooling and packing line. The system consists of product handling conveyors with a fully automated path selection system, with transfer to a spiral freezer, then feeding to packaging lines. PK Engineering worked on this project alongside our conveyor manufacture to […]

Thumbnail

The Forge, Sunderland – Meeting Place

The meeting place is a student social facility and is part of the Forge, a secure student village in Sunderland. PK Engineering are utilising their recent Trend SI status, to design and build HVAC control panels which incorporate Trend’s new IQ3 controller and IQ4 touch screen display.

Thumbnail

Installation of auto-collator – (Gold Bar), McVities, Carlisle

As part of a Continuous Improvement initiative we replaced the existing manual biscuit collators with an automatic system that takes the product from the primary wrapper, collates into blocks of 9 and presents these to the secondary wrapping machine. This has lead to a reduction in waste and the need to re-feed loose product. PK […]

Thumbnail

Rigg Hall, Egremont

PK Engineering, working in conjunction with Kier Construction, recently completed “Rigg Hall”a single storey industrial production and storage facility with attached 2 storey office area for James Fisher Nuclear located at Bridge End Industrial Estate, Egremont. The electrical & mechanical services installation within the Rigg Hall proved challenging as the facility is 23m high with […]